FeRFA Award Winning Project 2018
Brief Description
A high-profile client was due to visit the facility and the HSE & Facilities Manager organised for the existing floor to the main workshop area to be refurbished and a walkway to be rerouted.
The project involved colour matching the floor that had been installed by a previous contractor.
Problems and Requirements
The spec for the small project was to prepare and make good the existing floor to the tired looking workshop prior to the re-coating, with the exception of the main walkway that had to be re-routed as the current location didn’t work well.
Taking into account the tight timescale and short lead-time to turn around the manufacturing of the paint in specific colours, the works were completed in just one weekend. This delighted the Client who was now able to showcase their facilities to their potential high-profile customer.