Tight schedules require fast curing flooring
Brief Description
Having previously provided flooring solutions for the Snowdome, Remmers was again contacted to provide a flooring system to the newly refurbished ski hire centre.
600m2 of Remmers Floormix DQ was installed to the wash bays and toilets, locker and changing areas as well as the open staircase leading in from the main foyer area.
Problems and Requirements
The client required a seamless, hard wearing non-slip surface that was easy to maintain.
The DQ System was also applied to the in-situ coving and full wall height rendering in the wash bay area. As a tight installation schedule was in place, fast curing resins were used where possible.